Building Power. Creating Light

Quality Is Our Commitment

INTERNATIONAL FUTURE ENERGY

INTERNATIONAL FUTURE ENERGY Company, having expert and experienced managers and technical staff established in 2013 and successfully executed different projects as EPC (Engineering, Procurement and Construction) in the field of high voltage substations, power transmission lines and telecommunication sites.

INTERNATIONAL
& FUTURE ENERGY

At INTERNATIONAL FUTURE ENERGY, we build a sustainable future through the implementation of solar power plants, power substations, and transmission line projects.

Abarkoh 230 KV/DC Transmission Line
Abarkoh 230 KV/DC Transmission Line

Middle East

Middle East Construction of Abarkoh 230 KV/DC OHTL as PC project

Nakhles 132 KV/DC Transmission Line
Nakhles 132 KV/DC Transmission Line

Middle East

Construction of Nakhles 132 KV/DC OHTL as a PC project

26 inches Oil Pipelines 132 KV/DC Transmission Line

Middle East

Construction of 132 KV/DC OHTL in order to electrification to pipelines for transferring oil products manufactured as a PC project

Arian Plant 400 & 230 KV Transmission Lines
Arian Plant 400 & 230 KV Transmission Lines

Middle East

Construction of 400 & 230 KV Transmission Lines

Construction of 26 Inches Oil Pipe Lines 132/11 KV substations

Construction of two 132/11 KV substation 26 Inches pump stations and extension of a 63/6.3 KV substation in Bandar pump station

Construction of six 132/11 KV substations of Persian Gulf Water Pump Stations

Construction of six 132/11 KV substation for water pump stations of Persian Gulf as PC project

About Us

The most important activities of Powerst Company are as follows:

  • Designing and executing of high voltage substations as PC, EPC and turnkey projects
  • Designing and executing power transmission lines as PC and EPC projects
  • Designing and executing cabling projects up to 230 KV voltage
  • Designing, Supply and inspection of power transmission line and telecommunication towers and hardware and accessories
  • Designing and executing of DATA Center as PC, EPC and turnkey projects
  • Designing and executing of FACTS Devices and STATCOM/SVC Solutionsas PC, EPC and turnkey projects

HSE

Environment, Safety and Health Management

Powerst Company have tried its best to follow its goals in HSE system in order to save the human resources, industrial safety management, job health and creating a clean and healthy environment, so that the company has put the adaptation to this system’s necessities as the first priority of its activities. The HSE department of Powerst Company has assessed the extracted risks based on the risk assessment system in three divisions of health, safety and environment with systematic and compiled planning and based on the up to date instructions of the world. The mechanism to face the job risks is being done by managerial and engineering methods, or a combination of them so that in health part (H), the primary assessments and employees health continuous evaluation, job examinations and respective trainings including first aids are the instructions of this company. In industrial safety part (S), with performing the training courses in different levels, controlling the manner of executing the affairs by safety experts, preparing the specialized and general self protection equipments (PPE) and other methods has taken action to eliminating, replacing or controlling the safety risks. In the environment, part (E), in order to save the environmental and natural recourses capitals and preventing its demolition, has taken action to provide environmental instructions in power transmission lines and high voltage substations and the Powerst Company’s executive pillars have committed to perform it.

Our Album

Album 1
Album 2
Album 3
Album 4
Album 5
Album 6
Album 7
Album 8