Abarkoh 230 kV/DC Transmission Line
Construction of the Abarkoh 230 kV double-circuit overhead line as a PC project.

Overhead transmission lines delivered from 33 kV to 400 kV, including hydropower evacuation, plant interconnection and pipeline electrification.

Construction of the Abarkoh 230 kV double-circuit overhead line as a PC project.

Construction of the Nakhles 132 kV double-circuit overhead line as a PC project.

132 kV overhead transmission line for the Golen Gol hydropower project, Lot-4.

Construction of the Yitti 33 kV overhead transmission line.

132 kV double-circuit overhead line for the electrification of pipelines transferring refined products, executed as a PC project.

Construction of 400 kV and 230 kV transmission lines for the Arian power plant.

Construction of the Zaran combined-cycle power plant 230 kV transmission line as a PC project.

Construction of the NGL 3100 plant 230 kV transmission line.

Approximately 40 km of 132 kV overhead transmission line serving the Babak copper mine substation.