FACTS (Flexible AC Transmission Systems) and STATCOM/SVC are advanced power-electronics devices designed to enhance the stability, flexibility and efficiency of electrical transmission systems. They provide dynamic reactive-power support, voltage regulation and improved power quality.

FACTS & STATCOM/SVC

01Key Advantages

  • Fast and dynamic voltage support to maintain stable grid operation
  • Mitigation of voltage sags, flicker and harmonic distortion
  • Enhanced power-transfer capability of existing transmission lines
  • Reduced transmission losses and improved reliability
  • Seamless integration with renewables and BESS

02Applications

  • Utility-scale renewable power plants
  • Industrial plants and large commercial complexes
  • Transmission networks requiring reactive-power compensation
  • Microgrids and hybrid power systems
  • Urban and remote areas where voltage stability is critical

03Technical Features

  • STATCOM/SVC for dynamic reactive control and voltage stabilisation
  • FACTS devices including UPFC, SSSC and TCSC
  • Real-time monitoring and control via SCADA and EMS integration
  • Modular and scalable design tailored to grid requirements
  • High efficiency, reliability and low maintenance
  • Compliance with IEC, IEEE and local grid codes
  • Quick deployment for new installations and retrofit projects

04Capacity & Range

Indicative ranges — final design values are confirmed during the engineering phase.

Typical Specification & Analysis
ParameterTypical ValueTest Method
Voltage applicationMV up to 400 kVIEC 62271
Power ratingFew MVAr – several hundred MVArIEEE 1031
Response time1 – 2 cyclesIEEE 1031
Harmonic performanceFilter design to grid codeIEEE 519
Control interfaceSCADA / EMS / IEC 61850IEC 61850

05Delivery & Shipping Options

We deliver worldwide under Incoterms 2020 (FOB, CFR, CIF, DAP), with full documentation, third-party inspection and flexible packing.

Containerised valve halls

Converter and valve modules ship pre-assembled and factory-tested in containers.

Reactor & capacitor delivery

Air-core reactors and capacitor banks moved on flat-beds with vibration control.

Factory acceptance tests

FAT witnessed before dispatch; test reports travel with the equipment.

Commissioning support

Protection-setting and dynamic-performance verification on site after installation.